Maine Central-Final Version

<kuid:128675:180618>

Author: gandy-dancer
Kind: map
Build: 2.2
Size: 9.15MB
Uploaded: 2011-04-16
Loadings:
73
-
1
+

Maine Central-Final Version

Maine Central-Final Version
***************************
by Cookie aka gandy-dancer
***************************

Complete Maine Central route running Northeast from Portland to Skowhegan and Northwest to Berlin, NH - all mainline double track-20 interactive Sp2 passenger stations - many custom industries using both TRS and LARS Systems- about 20 active (SP2) passenger stations. Uses some of SirGibby's Payware. Map is large consisting of 163 baseboards - basically a double track double dog-bone route with many sidings with custom industries. For example - do the doughnut run- carry wheat to grist mill, pick up flour, carry flour to bakery, pick up general goods at bakery carry to distribution center to over the road semis - total miles about 70 and time involved 1.5 hours actual.

Updates:
Many industries require LARS System.
Major improvements to yards - Rigby Yard in Portland, Waterville Yard.
calls for updated reskined vehicles, structures,etc. that have been posted
route from Augusta to Winslow on back side of Kennebec River added going to Scott Paper Co.
Final Track tweaks added.
Triggers added and set in session.
Scenery tweaks added.
Industries added.
Signaling improvements
Portland Outskirts of city improved.

Enjoy!
trainz-build 2.2
world-origin {
latitude 38,53.4,1
longitude 77,1.2,-1
altitude 0
}
string-table {
old_port_portland

    Maine Central-Final Version
  • config.txt 60.75KB
  • maine central-final version.bmk 330 bytes
  • maine central-final version.gnd 18.35MB
  • maine central-final version.obs 970.92KB
  • maine central-final version.trk 294.64KB

Фотографии пользователей

Еще никто не добавил фото этого объекта