thru_girder_under_repair_1
<kuid2:210518:2223:2>
| Author: | bendorsey |
| Kind: | buildable |
| Build: | 2.9 (TS2009) |
| Size: | 409.72KB |
| Uploaded: | 2026-02-09 |
| Downloads: |
0
-
+
|
thru_girder_under_repair_1
A single span 2 track through plate girder bridge under going repair. This could be used to make an interesting scene
on a route since maintainence equipment exists on the DLS for either on track or off track repair. For those who like operations, this
offers a challenge to your ability to keep to the schedual.
Author: Benjamin R. Dorsey
- thru_girder_under_repair_1
- $screenshot$.jpg 8.51KB
- black.bmp 3.05KB
- black.texture.txt 28 bytes
- concrete3.jpg 52.57KB
- concrete3.texture.txt 32 bytes
- config.txt 2.45KB
- dark grey.bmp 12.05KB
- dark grey.texture.txt 32 bytes
- light grey.bmp 822 bytes
- light grey.texture.txt 33 bytes
- part_1.im 716.99KB
- wall10.jpg 68.85KB
- wall10.texture.txt 29 bytes
- wood2.jpg 121.70KB
- wood2.texture.txt 28 bytes
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment