BR MK1 Maroon BSK

<kuid2:30992:10012:1>

Author: sdark
Kind: traincar
Build: 1.3
Size: 555.19KB
Uploaded: 2019-10-21
Web-site: k
Loadings:
64
-
1
+

BR MK1 Maroon BSK

v4.5
Type: CORRIDOR BRAKE SECOND (BSK)
Built: 1952 - 1963
Seating: 24 (S & W regions 32), in 4 compartments
Length: 64.5 feet
Weight: 35 tons
Era: 1956 - late 60s
BR Region: All except Southern

The Corridor Brake Second, presented here in original condition as No. 34390 allocated to the London Midland Region, mounted on BR1 bogies and fitted internally with tungsten lighting, wooden interior panelling and steam heating.

Designed for standard passenger use, the passenger seating is arranged into four compartments, each with its own window, seating three abreast. Each compartment accessed by a 2 foot wide corridor (hence the term 'corridor' coach) running down one side of the coach. The 'Brake' equipment being housed in the Guard's compartment adjacent to the middle public access doors, with provisions made for the carriage of parcel goods (up to a maximum weight of two and half tons evenly distributed) taking up the remainder of the coach space.

Foldaway armrests were provided in each passenger compartment, and on crowded trains these could be lifted back into the seat thus providing an additional two seats per compartment. The Southern and Western region Second class compartments were fitted with no armrests, thus seating eight people to a compartment. In time, as coaches moved around the network, the nature of six and eight seated compartments presented problems to operational managers regarding seat reservation. To the extent that many armrests were removed or sewn into the upright positions.

The Guard's compartment, houses a vacuum brake and gauge, hand brake, desk table with swivel chair, wall mounted letter rack, food warmer, first aid box, emergency cutting tools and spare couplings and steam pipes. A wire mesh screen divides the goods carrying area from the passenger corridor, with the added security of bars fitted to all windows on the non corridor side.


USE

This type of coach would be found on mainline and secondary passenger trains on all British Railways' regions, during mid 1950s to late 1960s. While BSKs allocated to the Southern region were painted green, Maroon versions could be found visiting Southern metals on inter-regional trains.

While Southern region BSKs were painted green, Maroon versions could be found working over Southern metals on inter-regional trains.


LIVERY

A change of government in 1951 saw the passing of a new Transport Act that lead to the abolition of the Railway Executive in 1956, giving the Regions much more autonomy in their actions. One such regional development led to the London Midland, Southern and Western regions adopting new liveries based on their former pre-nationalised companies.

Urged on by the desire to replace the Crimson and Cream livery with a single coloured livery for ease of maintenance and cleaning, the Maroon livery made its first appearance in the spring of 1956. Instigated by the London Midland Region (the largest BR region), the livery closely matched that of the former London Midland and Scottish Railway, whose lines outside of Scotland, the LM region now controlled.

By the early 60s, Maroon was adopted by all regions except the Southern, as the ''official'' standard livery for all coaching stock. Coach ends were painted black until 1964 where upon new painting techniques, developed at the Southern Region's Eastleigh works, started the trend to paint the coach ends in the same colour as the body sides.

This livery lasted until the corporate Blue Grey livery was unveiled in 1965. During the mid 50s and late 60s, many rakes would be formed with a mixture of coaching stock bearing old and new liveries.


THE MARK 1 PROGRAMME

After the Second World War, wartime conditions highlighted the need for better standards in regards to vehicle lengths, profiles and couplings, for stock working between the 'Big Four' companies. A commission of senior officers was duly appointed by the UK 'Railway Companies Association' to create and implement a set of dimensions that would be applied to all future stock from each comp

Author: Stephen Dark & Alexander Barnard

    BR MK1 Maroon BSK
  • config.txt 52.78KB
  • dls_thumbnail.jpg 14.19KB
  • mk1_maroon_bsk_art
  • mk1_maroon_bsk_art_icon.texture.txt 97 bytes
  • mk1_maroon_bsk_art_icon.tga 32.02KB
  • mk1_maroon_bsk_body
  • env.texture.txt 26 bytes
  • env.tga 48.53KB
  • mk1_maroon_bsk.texture.txt 37 bytes
  • mk1_maroon_bsk.tga 1.50MB
  • mk1_maroon_bsk_body.im 243.67KB
  • mk1_maroon_bsk_shadow
  • black.texture.txt 28 bytes
  • black.tga 812 bytes
  • mk1_maroon_bsk_shadow.pm 217.90KB
  • tail_lamp.gs 5.92KB

License
-----------
IMPORTANT READ CAREFULLY: This License Agreement (AGREEMENT) is a legal agreement between you (either an individual or a single entity) and Stephen Dark and Alexander Barnard (D&B COACHWORKS) for the installation and use of the content supplied with the software patch identified above, which may include online or electronic documentation, associated media and printed materials (PRODUCT). By installing, copying, or otherwise using the PRODUCT, you agree to be bound by the terms of this

Фотографии пользователей

Еще никто не добавил фото этого объекта