Tunnel bore and portals with double track, Boronia No4 tunnel, NSW

<kuid:368725:20447>

Author: ElStoko
Kind: buildable
Build: 4.2
Size: 9.34MB
Uploaded: 2025-11-23
Downloads:
0
-
0
+

Tunnel bore and portals with double track, Boronia No4 tunnel, NSW

The 4th of 5 Boronia tunnels on Cowan Bank, NSW. It is 243ft long on an 11-chain curve and a gradient of 1 in 40 facing up trains.
The tunnel is modelled on its appearance in the steam era, before electrification works in 1959 gouged out brickwork from the portals and walls to give greater clearance for long double-deck EMU carriages.
The height difference between the north and south portals is 6ft (1.85m).

    Tunnel bore and portals with double track, Boronia No4 tunnel, NSW
  • collision_mesh.im 13.66KB
  • config.txt 4.52KB
  • dummy.im 1.30KB
  • shadow_lod0.im 6.80KB
  • shadow_lod2.im 3.80KB
  • thumbnail.jpg 40.82KB
  • tunnel normal-tunnel normal.texture.txt 86 bytes
  • tunnel normal.tga 8.00MB
  • tunnel-tunnel.texture.txt 47 bytes
  • tunnel.tga 8.00MB
  • tunnel_lod0.im 115.08KB
  • tunnel_lod1.im 92.26KB
  • tunnel_lod2.im 57.47KB
  • tunnel_lod3.im 40.62KB

User photos

No one has uploaded a photo of this object yet.