NSW road bridge span spline, concrete on steel beam, for 8m-wide road

<kuid:368725:30189>

Author: ElStoko
Kind: track
Build: 4.6
Size: 2.97MB
Uploaded: 2025-09-23
Downloads:
2
-
0
+

NSW road bridge span spline, concrete on steel beam, for 8m-wide road

Steel beams support an 8m-wide concrete slab roadway with wire mesh fence.
Each spline run represents only a longitudinal half section of a span. 2 spline runs running in parallel in opposite directions constitute a complete span. This longitudinal split in the spline is to enable the representation of bridges that cross a railway track at different angles.
Use <kuid:368725:20552> 'abutment for 8m-road bridge, concrete, with 8m wings' to support the bridge span at each end.
The concrete road surface of the spline is incomplete because a separate road spline is intended for this surface. Use <kuid:368725:30186> 'Primary 2L,8m rural road, sealed, double yellow line, clean, no shoulder' or <kuid:368725:30187> 'Primary 2L,8m rural road, sealed, double yellow line, dirty, no shoulder' for the road spline across the bridge.

    NSW road bridge span spline, concrete on steel beam, for 8m-wide road
  • concrete_albedo.png 1.38MB
  • concrete_albedo.texture.txt 38 bytes
  • concrete_normal.png 825.69KB
  • concrete_normal.texture.txt 90 bytes
  • concrete_parameters.png 112.26KB
  • concrete_parameters.texture.txt 73 bytes
  • config.txt 2.65KB
  • endcap_prev.trainzmesh 1.42KB
  • fence_albedo.png 284.20KB
  • fence_albedo.texture.txt 59 bytes
  • fence_normal.png 251.09KB
  • fence_normal.texture.txt 84 bytes
  • fence_parameters.png 141.84KB
  • fence_parameters.texture.txt 67 bytes
  • span_0.trainzmesh 10.68KB
  • span_1.trainzmesh 5.91KB
  • thumbnail.jpg 36.34KB

User photos

No one has uploaded a photo of this object yet.