TGR Fingal Line 1955 Demonstration Session
<kuid2:45176:100032:3>
| Map: | TGR Fingal Line 1955 NG42 Safeworking Layout |
| Author: | pware |
| Kind: | profile |
| Build: | 3.7 |
| Size: | 161.07KB |
| Uploaded: | 2026-02-21 |
| Downloads: |
0
-
+
|
TGR Fingal Line 1955 Demonstration Session
Before attempting this session for the first time, please read the project manual that is available from the asset 'Fingal Line Safeworking Project',<kuid2:368725:200006:5>.
A sample of the safeworking process involving signals, point levers, right-of-way tickets, ordinary staffs and miniature electric staffs. H8, under AI control with an up through empty coal is approaching Avoca while T223 with a down local pickup goods is waiting on the goods road. One SWO is on Avoca platform to handle the signal lever and the exchange of staffs and tickets. Another is waiting by the goods shed to throw the track switches that will let the down goods onto the main line after the up goods has cleared Avoca.
- TGR Fingal Line 1955 Demonstration Session
- config.txt 103.51KB
- profile.dat 237.90KB
- profile.lyr 36 bytes
- profile.obs 2.81KB
- profile.rlr 36 bytes
- profile.trk 240 bytes
- thumbnail.jpg 65.53KB
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment