NSWGR Berrima Branch 1960s
Details

NSWGR Berrima Branch 1960s

<kuid:45176:100098>

Author: pware
Kind: map
Build: 3.7 (TS12 SP1)
Size: 1.77MB
Uploaded: 2025-10-16
Downloads:
1
-
0
+

NSWGR Berrima Branch 1960s

This merges with PGibbon's Picton 2 Goulburn route. Locate the trackmark 'Berrima Branch' in the Picton route then DELETE the baseboard immediately to the WEST of this point.

Merge the eastern end of the Berrima route at the place where the baseboard was deleted from the Picton route, it will fit like a key in a lock.

Join the end of the track from the Berrima branch to the spline next to Junction 104. Some smoothing of the ground heights and retexturing around the join will be needed.

This layout shows the line as it existed upto to the mid 1970s when the section between the cement factory and colliery was still in use. It is not suited for complex AI operations.

Industries are:-
Berrima Fertilizer - consumes limestone aggregate and produces bagged and/or paletted bagged fertilizer (crushed limestone)
Berrima Cement Works - consumes limestone aggregate and coal; produces cement
Berrima Colliery - produces coal (for the cement factory)
Berrima Colliery Water Tank - produces water

    NSWGR Berrima Branch 1960s
  • berrima_branch1960s.jpg 53.83KB
  • config.txt 19.10KB
  • mapfile.bmk 330 bytes
  • mapfile.gnd 3.05MB
  • mapfile.lyr 30 bytes
  • mapfile.obs 515.20KB
  • mapfile.rlr 36 bytes
  • mapfile.trc 32 bytes
  • mapfile.trk 165.01KB

User photos

No one has uploaded a photo of this object yet.