TMR17 - The Shortz Session 1 - Gondola Shuffle
<kuid2:69871:2265:1>
| Map: | The Shortz & Kerl Traction Railroad - Model Trainz |
| Author: | philskene |
| Kind: | profile |
| Build: | 4.4 |
| Size: | 54.88KB |
| Uploaded: | 2026-01-08 |
| Downloads: |
0
-
+
|
TMR17 - The Shortz Session 1 - Gondola Shuffle
This session is for Trainz Model Railroad 2017, TMR17, the Shortz & Kerl Railroad.
Important information about the session can be found in the Trainz Model Railroad forum on the N3V Trainz Forums site. Search for Short & Kerl.
All content is either built-in or from the Download Station. Do use Manage Content to make sure all the dependencies have been captured.
Over in the yard are three gondolas. Use them for the following tasks --
Supplying steel coil to Tubemakers.
Cement to Boots Concrete.
Concrete pipes to the Dockside.
When completed, return the gondolas to the yard and sign off in the Depot.
As an experienced engineer with an experienced train crew you may choose to do these tasks in any order.
In the Map View (Ctrl-M to toggle on/off) all industries have the prefix IND.
The gondolas will load or unload when spotted between the yellow markers.
Other trainz will be circulating around the layout. The route taken by these trains can be seen in this video
https://www.youtube.com/watch?v=072b_2p7nsc
At crossing loops these trains will always take the right track. You should give them priority and time your moves from one yard to the next so as to not impeded the AI trains. It may be necessary to reset switches to help the AI trains on their way if you have changed the setting of switches for you own purposes.
- TMR17 - The Shortz Session 1 - Gondola Shuffle
- config.txt 21.58KB
- profile.dat 224.22KB
- profile.lyr 28 bytes
- profile.obs 36 bytes
- profile.rlr 36 bytes
- profile.trk 68 bytes
- thumbnail.jpg 18.78KB
User photos
No one has uploaded a photo of this object yet.

Comments:
Sign in to post a comment